Team progress

Minesight Innovation Challenge

Challenge progress

From engineering ideas to prototypes

Updated: Oct 23, 2026

Current stage: prototype development and preparation for final testing

More than 90 teams from 10 countries submitted their ideas. Five finalists are developing remote excavation solutions. Mid-Project Reviews have been completed, and the teams are preparing for final testing.

  • 90+ teams submitted ideas
  • 10 participating countries
  • 5 finalist teams
Timeline

Challenge timeline

From the open call to the final testing of prototypes.

Exact dates for final testing will be announced separately.

  1. 1

    Completed April 2026

    Launch and call for ideas

    Launched the international challenge and invited teams to propose remote excavation solutions.

  2. 2

    Completed 2026

    Selection of five finalists

    Following evaluation, five teams were selected to continue developing their prototypes.

  3. 3

    Completed

    Mid-Project Reviews

    Reviewed the progress of three Ukrainian teams during an in-person visit and two international teams online.

  4. 4

    In progress

    Prototype development

    Teams continue development and prepare for final testing.

  5. 5

    Planned November 2026, tentative

    Final testing

    Prototype testing against the challenge requirements and publication of the evaluation results are planned.

Progress so far

Work completed so far

Mid-Project Reviews: a closer look at the teams’ work

From 14 to 18 September 2026, Minesight representatives visited the Ukrainian finalists in Kyiv and Lviv and inspected the test site. AUTOGENBOT and WExMEx presented their progress in separate online meetings.

In person · Kyiv and Lviv

14–18 September 2026

TREMBITA · Kaban Digger · Badger

Online

2 and 3 October 2026

AUTOGENBOT · WExMEx

Teams

What the finalists are working on

Five teams are developing their approaches to remote excavation. Explore their progress and project materials.

1

TREMBITA

Ukraine

TREMBITA is developing a robotic platform combining precise RTK navigation, soil lifting, water cleaning and video monitoring to excavate suspicious objects remotely.

2

Kaban Digger

Kaban Cargo LLC · Ukraine

Kaban Digger is developing a semi-autonomous system for remote soil micro-excavation near explosive objects, designed for one operator or an operator and assistant, without dedicated supporting infrastructure.

3

Badger

Lviv Polytechnic · SID City · Ukraine

Badger is developing a compact remote micro-excavation module for ground robotic platforms. Its rotating manipulator allows tools to change without retracting the boom from the object.

4

AUTOGENBOT

Autogenbot Inc. · United States and India

AUTOGENBOT is developing an off-road robotic platform with camera-based navigation and a supersonic air-jet excavation head. High-pressure air removes soil to expose hazardous objects remotely.

5

WExMEx

Water-Jet Excavation for Mine Exposure · University of Oslo · Norway

WExMEx at the University of Oslo is developing a hydro-excavation system: a controlled water jet removes soil, a vacuum line extracts slurry, and a camera monitors object exposure.

Test site

Preparing the test site

Preparations for final testing include setting up test areas and working with different soil conditions. This overview video shows the test site taking shape.

Testing uses inert objects containing no explosives.

In the media

The challenge in the media

Coverage of the engineering solutions, finalists’ work and the goals of the Minesight Innovation Challenge.

  1. Five engineering approaches to remote excavation

    How the Minesight Innovation Challenge finalists are developing their solutions for humanitarian demining.

    Article in Ukrainian

  2. How engineering solutions can support deminers

    Ukrainian developments, collaboration between engineers and deminers, and the opportunities created by the challenge.

    Article in Ukrainian

  3. Excavation: an engineering challenge

    Why working with the soil around a detected object calls for new solutions, and the opportunity the challenge offers developers.

    Article in Ukrainian

  4. The technology gaps in humanitarian demining

    A look at the technology needed for humanitarian demining and the engineering solutions that could address those needs.

    Article in Ukrainian

What’s next

What’s next

Teams are working on their prototypes and preparing for the final stage. Further updates and results will be published on this page.

  1. 01

    Prototype preparation

    Continued development and preparation of the solutions for testing.

  2. 02

    Final testing

    Tentatively November 2026. Exact dates will be announced separately.

  3. 03

    Publication of results

    Following the final stage, we will publish the prototype evaluation results.

If the video does not play, open the original post. Open original